Case Study: Proof of Cost Savings/Problem Solving/ROI With OEM Engine Manufacturer
The Challenge:
A major OEM engine manufacturer had a large defense customer that was changing out models in a specialty military vehicle. The engine OEM needed 2,000 engines packaged during the week of a shutdown.
The Solution:
Export Corporation jumped in head first and set up a satellite facility to pack 2,000 engines in 4 days. This included scheduling and routing 13 truckloads a day, receiving engines on racks from the OEM facility, and shipping out the packaged product from our satellite facility. We designed the engine package with a convertible base to facilitate multiple engine contenting stages.
The Result:
The OEM engine manufacturer was able to get their engines to the customer in half the time time allowed during the shutdown. Serious problem solved.